Item type | Location | Call number | Status | Date due |
---|---|---|---|---|
Not To Be Taken Out |
Turkeyen Campus
Processing Center
|
QH545 .D7 G85 2015 (Browse shelf) | Not for loan |
Includes bibliographical references.
Part 1: Introduction -- Part 2: London Convention and London Protocol -- Part 3: Processes -- Step 1: Dredged material characterization -- Step 2: Waste prevention audit and management options -- Step 3: Action list -- Step 4: Selecting a disposal site -- Step 5: Impact assessment -- Step 6: Permitting system -- Step 7: Permit conditions -- Step 8: Monitoring -- Part 4: Case study -- Appendix: How to construct and use a turbidity tube.
Gift Gift April 28, 2016 U/N 286209 $3500 IMO
There are no comments for this item.